Subject: MTI VEIN RUNNER VR-1XSB SINGLE BOOM JUMBO
This jumbo was sold to a local tunneling contractor in April 2008. They purchased it from the manufacturer MTI. It was supplied in "Rebuilt" condition. The Pro Forma Invoice, specifications and bill of material for the sale are attached. Pictures of the jumbo supplied by MTI prior to shipment are also attached.
The jumbo was used to excavate 500' of small tunnel. The unit has been used for 51 hours since the rebuild. It has been in indoor storage for the past 3.5 years. One year ago it was started to move it but the operator was unaware that the motor had been drained of oil. The engine is now ceased. Thieves also stole the electrical cable recently.
Approximately 2 - 3 weeks would be required to remove and replace the engine with a new rebuilt Deutz F4L-912W engine and to replace the stolen electrical cable.
The Price of the jumbo, supplied in 'as is' condition with the new rebuilt engine and electrical cable installed, is $335,000.00 CAN, FCA Belleville, Ontario Canada. Belleville is a 1.5 hour drive east of Toronto. You are welcome to inspect this unit at your convenience.
info@tolimared.com
-- Edited by admin on Monday 13th of February 2012 07:58:05 AM
Crane for the making veins in the runner is time of the hydraulic pressure to boost the life of the mountains in the temporary steps. Transiting of cranes to including with professional essay writing services have the operation manager to that site.
-- Edited by cekytacyv on Tuesday 24th of July 2018 05:32:00 AM